Run Order with JMP DOE
Hi, I have to set-up a DOE (Response Surface) where I have a machine as blocking factor. Since it is very time consuming to change the temperature of the machine, I want to have the run order of the DOE with temperature going from low to high. Right now, when I design the DOE, JMP gives me high, low and then intermediate.