cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Learn how to build custom Python data connectors and further customize JMP’s Data Connector Framework with the Python Data Connector Demo, available now in the JMP Marketplace!
  • See how to create experiments to support product design and ID useful product features. Register for June 12 webinar, 2pm US Eastern Time.
JMP Bar Chart

Welcome to the JMP User Community!

Ask questions, get answers, meet other JMP users

Learning Resources

Latest Discussions

  • Edit Effect Summary and Interaction Profiles

    Hello all, I have two trivial questions.  Is there an option to add two blue lines to the effect summary plot? I want there to be a line at p=0,05 and p=0,001 beside the one at p=0,01. Like this:   Is there a way to copy the interaction profiles to the graph builder?  I don't like the format and want to change things, like the legend or the order of the x Labels Thanks in advance!

    fizzy fizzy
    Discussions |
    Jul 26, 2023 8:40 AM
    1390 views | 1 replies
  • How can set different cells to different colors

    dt=Open("$SAMPLE_DATA/Big Class.jmp");dt[1,1] is set to red
    dt[1,2] is set to white
    dt[1,1] is set to clear coloringThanks!

    lala lala
    Discussions |
    Jul 26, 2023 8:31 AM
    1481 views | 2 replies
  • Sort by

    HelloI have a table with 2 columns, "% of Total" and "Correlation"I would like to sort simultaneously both columns in Descending only but when I run the script, the column Correlation is sorted like Descending but % of Total is sorted like Ascending What is wrong with my script? dt << sort ( by ( "Correlation" , "% of Total" ), Order ( Descending ), Replace table ); 

    Dennisbur Dennisbur
    Discussions |
    Jul 26, 2023 7:20 AM
    40746 views | 1 replies
  • Extending the Linear regression

    Hi,JMP has constitute the linear regression formula. In this case Q is the slope. I wanted to see the Q=7 and Q=8 demonstrated in the line plot about. How do I do that in jmp. Otherwise I need to calculate and put in excel or data table, 

    zahrein98 zahrein98
    Discussions |
    Jul 26, 2023 3:51 AM
    2123 views | 2 replies
  • JSL execute by .bat file crash and hang

    It seems like I have a .bat file that runs a JSL script, which processes multiple CSV files as input.
    However, when the number of input CSV files increases, the .bat file often crashes and takes a long time without completing the task.On the other hand, executing the same number of input CSV files through JMP and the JSL script only takes 1-2 hours.The speed difference is significant. Do you know t...

    AlphaBighorn347 AlphaBighorn347
    Discussions |
    Jul 26, 2023 2:45 AM
    4395 views | 7 replies

Latest Discussions

  • Edit Effect Summary and Interaction Profiles

    Hello all, I have two trivial questions.  Is there an option to add two blue lines to the effect summary plot? I want there to be a line at p=0,05 and p=0,001 beside the one at p=0,01. Like this:   Is there a way to copy the interaction profiles to the graph builder?  I don't like the format and want to change things, like the legend or the order of the x Labels Thanks in advance!

    fizzy fizzy
    Discussions |
    Jul 26, 2023 8:40 AM
    1390 views | 1 replies
  • How can set different cells to different colors

    dt=Open("$SAMPLE_DATA/Big Class.jmp");dt[1,1] is set to red
    dt[1,2] is set to white
    dt[1,1] is set to clear coloringThanks!

    lala lala
    Discussions |
    Jul 26, 2023 8:31 AM
    1481 views | 2 replies
  • Redo - for a Report in a Dasboard?

    Redo Analysis from the the red triangle/Redo menu is great.It generates an exact copy of the current report. Is there also a possibility to get an exact copy of a report (e.g. Graph uilder Plot ) that is inside a Dashnoard?
    - including the filters that were applied by the surrounding dashbord?

    hogi hogi
    Discussions |
    Jul 26, 2023 1:43 AM
    875 views | 0 replies
  • How to get date yesterday?

    I would want to get the date yesterday, I am using the today () functiondateNow = Format (Today(), "m/d/y");However, I don't know how to derive from dateNow the date yesterday. Tried using d = (dateNow - 1);but is not working.

    UserID16644 UserID16644
    Discussions |
    Jul 26, 2023 1:21 AM
    2590 views | 2 replies
  • how to change variable in multiple JSLs at once

    Hi, I use include() to run multiple JSLs in each JSL I have variable "todaydate". However, now I want to run all the JSLs using include, but change the todaydate across all JSLs to 03Jun2023. How I can do that ? todaydate = Format date( Today(), "ddmonyyyy" );

    I was thinking:
    todaydate = "03Jun2023";  // this will replace in all 10 jslinclude(jsl1);include(jsl2);...include(jsl10);

    dadawasozo dadawasozo
    Discussions |
    Jul 25, 2023 4:18 PM
    3354 views | 5 replies

Latest Discussions

view all discussions