Sample Size Calculation
My current process is operating at a 0.01 defect frequency (e.g., 3 defects in last 300 units inspected). If I make a process change that could potentially increase the defect frequency, how many units will need to be inspected post-change to determine if a statistically significant difference in defect frequency?
dale_lehman
albiruni81
David_Burnham