Control Charts: is it possible to automate phasing?
I'm using control charts to monitor daily traffic data. Currently, in excel, I have a process set up to flag statistically significant changes (as defined by lean sigma e.g.: 6 points above the median, etc). Even though the flag is there, it's still a manual process to create charts. Is there an automated way within JMP to change the phase of a chart based on predetermined rules? Thanks!