cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Register to attend Discovery Summit 2025 Online: Early Users Edition, Sept. 24-25.
  • New JMP features coming to desktops everywhere this September. Sign up to learn more at jmp.com/launch.

Welcome to the JMP User Community!

Ask questions, get answers, meet other JMP users
cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 

Learning Resources

Latest Discussions

  • Mean Difference with confidence intervals

    So I'm running an experiment that tests rodents consumption of seeds. The results showed that rodents from the control group consumed 898 seeds on average whereas another group of rodents that received treated seeds consumed only 447 seeds on average. I would like to express these results as the phrase, "rodents from the treatment group consumed 50.2% less seeds than those from the control." {1-(4...

    Mananahi Mananahi
    Discussions |
    Sep 10, 2019 1:43 PM
    6852 views | 4 replies
  • What is the difference between log and log10 transformation in JMP?

    Does someone know what the difference is between the log and log10 transformation in JMP? I cannot find any information on it... I discovered that they do not give the same result and I wonder what the reason is.  Thanks a lot!  Laura

    LauraB LauraB
    Discussions |
    Sep 9, 2019 4:33 AM
    25354 views | 2 replies
  • Dashboard not updating as expected.

    Hi all. I'm running 3 simple & identical scripts to create SPC charts for Operators. The idea is that they'll enter basic test results, click one button and then observe for shifts/trends/outliers. Rather than displaying all of the data on the charts, the scripts are setup to show just the last 30 datapoints on the SPC charts. When I add (say) 10 more rows of data, the scripts move on as planned, ...

    kom kom
    Discussions |
    Sep 8, 2019 1:21 AM
    5256 views | 4 replies
  • Need coefficients for equation

    Hello, I need to generate the coefficients for the fit equation between 2 variables. However JMP generates equations by modifying the independent variable, which is not what I want. Is there anything that can be done to avoid JMP in doing so? For example, for the below table, JMP generates this equation, "Y = 1124.1 - 38.7*X + 9.8*(X-23)^2 + 0.7*(X-23)^3 - 0.1*(X-23)^4". What I want is just A*X^4 ...

    raj138 raj138
    Discussions |
    Sep 8, 2019 12:03 AM
    5553 views | 5 replies

Latest Discussions

  • Mean Difference with confidence intervals

    So I'm running an experiment that tests rodents consumption of seeds. The results showed that rodents from the control group consumed 898 seeds on average whereas another group of rodents that received treated seeds consumed only 447 seeds on average. I would like to express these results as the phrase, "rodents from the treatment group consumed 50.2% less seeds than those from the control." {1-(4...

    Mananahi Mananahi
    Discussions |
    Sep 10, 2019 1:43 PM
    6852 views | 4 replies
  • Saving multiple distribution data in custom power point

    Hi I am a moderate JMP user but I analyze certain data set frequently hence looking for automated way to save data directly to power point. I would like to check if there is a way to do it through JSL.  I have .jrp file which has distributions, now I want to save that as power point but not using JMP Save as option. I want to customize and format the data saved in ppt through JSL. I have around 20...

    JMPMODUSER JMPMODUSER
    Discussions |
    Sep 6, 2019 5:08 PM
    5266 views | 3 replies
  • Chang default numeric format

    I have a fixed workstream where I import an excel file into JMP12. This file consists of mixed data type columns. My issue is with the format of the numeric columns. By default, JMP formats the column as "best" which is anything but (e.g. 1e-9 is displayed as 0.000000001). Is there a way to change the default number format to engineering rather than best? 

    TheSource TheSource
    Discussions |
    Sep 6, 2019 5:04 PM
    2113 views | 1 replies
  • Which feature to use to analyze material changes over time?

    I have a material property that is measured at some irregular time intervals, usually whenever a new batch of material arrives. The measurement process gauge is known. I want to look at this property and identify changes in material performance and flag the vendor for improvements. Which feature in JMP will help me do this? Thanks,Siva

    jsrk2084 jsrk2084
    Discussions |
    Sep 5, 2019 11:52 AM
    1847 views | 1 replies
  • How to check if "Create Database Connection" is successful?

    Many of my scripts connect to a DB as soon as they are started. DB is in intranet, so users need to:1. Be connected to internal network OR have VPN on2. Have ODBC source set up correctly Sometimes they don't. I want to warn users that the DB is not available instead of script erroring on them. What would be a correct way of checking if "Create Database Connection" was successful and returned a val...

    miguello miguello
    Discussions |
    Sep 5, 2019 8:40 AM
    2301 views | 2 replies

Latest Discussions

  • How to Add Profit Matrix to Neural Net Confusion Matrix

    Hi all, I'm using a neural net to predict whether or not a customer will prefer to buy retail items at a markdown or if they are likely to buy full-price (i.e., "bargain buyers" vs. traditional shoppers). I'd like to incoporate the opportunity cost of a false positive (giving discounts to what would otherwise be a full-price shopper) using a profit matrix, but changing values on the matrix in the ...

    GhostBen GhostBen
    Discussions |
    Aug 5, 2019 8:00 PM
    1374 views | 0 replies
  • Capability Animation - How to see the LSL/USL Value?

    I just discovered this nifty tool called the Capability Animation, where you can play around, dragging the spec limits and mean shifts, and it simulates your capability indices. But, I cannot see the actual LSL/USL values as I drag them! Does anyone know how to make this happen?

    Antonio80 Antonio80
    Discussions |
    Jul 9, 2019 1:31 AM
    1313 views | 0 replies
  • Unable to allocate enough memory in access or evaluation

    Hi,I'm trying to use the Multivariate platform to perform a correlation between 6 time points (rows) across 73500 columns. My final goal is to output a  73500x73500 correlation matrix. When I try to run it, I immediately receive this pop out message:Unable to allocate enough memory in access or evaluation of 'List' , {/*###*/Estimation Method( 0 ), Matrix Format( 2 )} What's the issue? I'm using J...

    ns ns
    Discussions |
    Jul 8, 2019 9:04 AM
    1436 views | 0 replies
  • How to Post JSON data to a site via API functionality: "Unsupported Media Type"

    Hi There, I am trying to perform a POST request to post some JSON data to a server, but unfortunately as of now I keep getting a 415 error. The goal of this script is to upload a JSON formatted file (or something of the like) to the server for other users to download/read. I noticed that there are very few POST examples with JSL, but quite the abundance with GET, which I have no problems with. I w...

    liqinglei419 liqinglei419
    Discussions |
    Jul 2, 2019 6:33 AM
    1666 views | 0 replies
  • How to analyze crossover design data in JMP

    I had crossover design data from one of my experiment, and I want to analyze it according to the rules of crossover design. Can someone please help me with this?

    sharmachetan sharmachetan
    Discussions |
    Jun 14, 2019 2:34 PM
    1285 views | 0 replies
view all discussions