How do you script optimization of JMP formulas and save the results?
I have a detailed formula in my JMP table I need to optimize. I'll need to incrementally vary 3 inputs and let the rest be optimized. Is there a way to lock and change the three variables, optimize the others, and save the results for hundreds or thousands of options? I can do this manually in the prediction profiler, but it becomes unmanageable for the number of cases I'll need.Thanks!