Custom DOE with linear constraints
Hi DOE cracks,we want to optimize a process with a RSM DOE.There are 6 continuous factors; 5 responses for optimization (mostly Match Target) and a linear constraint for two of the continuous factors (kind of mixture). The constraint is: 10 <= FactorA / FactorB <= 20
Using the custom designer platform, we tried to add mixture factors or use a script for disallowed constraints but nothing worked so...
