process DOE which option is better and why - small batch or split plot for larger batch
Hi,i would like to design DOE for the following situation:The process has 3 steps. option A - in step 1 prepare a small batch of 100g and continue with that to the next steps. each batch per one DOE run. this means that all the parameters would be easy to changeoption B - in step 1 prepare a small batch of 500g and continue with 100g out of this Big batch to the next steps - this batch will last...