Analysis of a Mixture DOE with stepwise regression
In Mixture case studies (webcast & JMP documentation library) I notice that backward regression is used to analyse the results. Why is stepwise regression not used with forward regression or all possible models in regualr (non Pro) JMP? Is stepwise not possble because of the special nature of mixture models?