Setting up a Nested and Crossed MSA Gauge R&R Analysis
I have a Gauge R&R study that I have questions about analyzing in JMP Pro 17.1. First I’ll give the full background and then I’ll ask the questions. (This is a long post) Background and Setup: In this study we have 2 operators and 3 machines (called BuildMachine), each of which produces 3 parts for a total of 9 parts. Each operator measures all 9 parts three times. This means (I believe) that t...