Capability analysis in Control Chart builder
Dear JMP community,i am playing a bit with the control chart builder and the capability analysis when I have control limits on the column i am looking at. I am doing a Levey Jennings control chart, where i hide the moving range since we do not normally look at it - but when i remove the moving range plot the process capability analysis is removed from the output as well. Is there a way to force it...