Graph Builder
Is it possible to define a specific size of graph in order to get all the graphs with the same size when copying them into a document ?
Find courses, tutorials, and lots of other methods of learning JMP.
view all learning resourcesIs it possible to define a specific size of graph in order to get all the graphs with the same size when copying them into a document ?
I have created several experimental designs, including ones with quadratic effects. I’ve noticed that the power of these quadratic effects is always relatively low. Why is that the case? What can be done about it? Regards Klaus
Hi, I have a JSL code to append button boxes for row selection. The problem is that it keeps appending duplicate boxes even if only 1 row is selected. I only want to append 'n' box for 'n' selected rows. If no rows are selected then it should delete all the boxes in the table box It added 10 boxes just by selecting 1 row. Names Default To Here( 1 );
dt2 = Open( "$SAMPLE_DATA/Iris.jmp", invisible...
For context, I am running analyses on a proteomics experiment. I have two datasets: Intraday (comparing AM to PM), and Longitudinal (comparing Day 0 to Day 30 to Day 90) for protein concentration. For Intraday, I have 600 proteins I am looking at. For Longitudinal, I have 68. I want to find out the magnitude of change between the time points for each protein, so I am trying to find z-scores. I am ...
Hello comunity,
I am using JMP 18 on macOS Sequoia 15.6.
I am using Database > Open table (or Data Connector) to add a data source I want to using.
I click on New connection... and it shows the data sources (DSN) I have set up on ODBC.
I select the data source I want and click on Choose DSN and I get this error.
I am quite certain I have set up my DSN correctly.
Anyone using the same OS that ...
Is it possible to define a specific size of graph in order to get all the graphs with the same size when copying them into a document ?
I have created several experimental designs, including ones with quadratic effects. I’ve noticed that the power of these quadratic effects is always relatively low. Why is that the case? What can be done about it? Regards Klaus
For context, I am running analyses on a proteomics experiment. I have two datasets: Intraday (comparing AM to PM), and Longitudinal (comparing Day 0 to Day 30 to Day 90) for protein concentration. For Intraday, I have 600 proteins I am looking at. For Longitudinal, I have 68. I want to find out the magnitude of change between the time points for each protein, so I am trying to find z-scores. I am ...
Hello comunity,
I am using JMP 18 on macOS Sequoia 15.6.
I am using Database > Open table (or Data Connector) to add a data source I want to using.
I click on New connection... and it shows the data sources (DSN) I have set up on ODBC.
I select the data source I want and click on Choose DSN and I get this error.
I am quite certain I have set up my DSN correctly.
Anyone using the same OS that ...
I am trying to determine an appropriate sampling plan for a manufacturing process which has a dimensional in process control (a length). There is a USL and LSL with a target. Cpk and Ppk are both coming in at >2 on a sample size of >2000 units across two mfg. lots.
We sampled at a rate of ~5%. I’m trying to figure out what the minimum sample rate is to ensure quality (95/95 confidence coverage). H...
For context, I am running analyses on a proteomics experiment. I have two datasets: Intraday (comparing AM to PM), and Longitudinal (comparing Day 0 to Day 30 to Day 90) for protein concentration. For Intraday, I have 600 proteins I am looking at. For Longitudinal, I have 68. I want to find out the magnitude of change between the time points for each protein, so I am trying to find z-scores. I am ...
I am trying to determine an appropriate sampling plan for a manufacturing process which has a dimensional in process control (a length). There is a USL and LSL with a target. Cpk and Ppk are both coming in at >2 on a sample size of >2000 units across two mfg. lots.
We sampled at a rate of ~5%. I’m trying to figure out what the minimum sample rate is to ensure quality (95/95 confidence coverage). H...
very simple tasks - JMP says NO.
TaskJMP saysworkaroundswishimplementedadd column via Tables/Updatecolumn existsrename one of the columnsAllow Update platform to create new columns if they already exist in the table to be updatedv19copy a cellformula column- recode to dummy column | copy cell | delete dummy column
- screenshot | OCREdit Pane allows for text copy even if no edit
...
When conducting Reliability Growth analysis in JMP (version 18), the confidence level is defaulted as 95%. How can I change it to other level, e.g., 80%? Thanks.
Dear all
I am assigned a task to perform recurrence analysis on our data.
The data we have are robot repairs. We want to see repair events and cost in response to accumulated transactions using recurrence analysis.
I attached a simulated data for this question. It only has three bots since we haven't decided how to arrange the data and I just put those three bots manually. I will update with more ...
REGISTER HERE Special Guest Presenter:Prof. Nathan CoatesFaculty Director, Master of Science...
Una introducción práctica para nuevos usuarios, usuarios con licencia de prueba o cualquier persona...
The latest release of JMP and JMP Pro brings a variety of time-saving and analytic enhancements, ran...
German Mastering JMP Webinar Erfahren Sie, wie Sie sequenzielle Messdaten analysieren, bei de...