A non-linear constraint on mixture DOE
I want to add a non-linear constraint on the DOE mixture-process problem.For examle, lets say that we have a mixture of A, B and C with limits on amount of each given [amin, amax], [bmin, bmax], [cmin, cmax]. Now there is the fourth component in the mixture (water) which is used to control the density of the formulation. We put more water to lower the density and decrease the amount of water to in...
msharp
jjhartwi
j_bonnouvrier