Analysis of split plot DOE results
In analysis of a (split) split plot REML as well as Generalized regression is used, which anaysis method is preferred?
Find courses, tutorials, and lots of other methods of learning JMP.
view all learning resourcesIn analysis of a (split) split plot REML as well as Generalized regression is used, which anaysis method is preferred?
I use Graph Builder quite a bit to demonstrate where my JMP users are based in the world. We can automatically pick up where they are based via a Smartsheet ( https://www.smartsheet.com/) but one of the annoyances is that Smartsheet calls the UK Great Britain which JMP doesn't recognize. This means that i have to change these manually each time to run the report, I realize I could have a script to...
Hello, I've recently moved to JMP14 and have some scripts that stop working due to "invalid argument in access or evaluation of 'Close'". Basically in JMP12 if I wanted to close table ABC and save it as a csv file, I'd use the following command:close(data table ("ABC") << save("\C:\Temp\ABC.csv"));
In JMP14, I cannot do this anymore. Does anyone know what would be the equivalent to this command in ...
Dear community experts, I try to import the dataset with continuous data (factor6, 7, 8, 9, 12, 13,15 and everything beyond fifteen are responses) from JMP to excel. After export I cannot change the data type to continuous, its not available. I already changed everything to number formate and it didnt help.Its irritating for me also, that all the responses are continuous, even they come from the s...
I have a list of X and Y values that the user selects. I want those list values to populate the x and y axis in graph builder. Is this possible.? I continually get an error that the column names cannot be found?For example:x_values = {"x1", "x2", "x3"}y_values = {'y1", "y2", "y3"}I want the x axis to be the x_values and the y axis to be the y_values. This changes by how the user selects though so ...
In analysis of a (split) split plot REML as well as Generalized regression is used, which anaysis method is preferred?
I use Graph Builder quite a bit to demonstrate where my JMP users are based in the world. We can automatically pick up where they are based via a Smartsheet ( https://www.smartsheet.com/) but one of the annoyances is that Smartsheet calls the UK Great Britain which JMP doesn't recognize. This means that i have to change these manually each time to run the report, I realize I could have a script to...
Hello, I've recently moved to JMP14 and have some scripts that stop working due to "invalid argument in access or evaluation of 'Close'". Basically in JMP12 if I wanted to close table ABC and save it as a csv file, I'd use the following command:close(data table ("ABC") << save("\C:\Temp\ABC.csv"));
In JMP14, I cannot do this anymore. Does anyone know what would be the equivalent to this command in ...
Dear community experts, I try to import the dataset with continuous data (factor6, 7, 8, 9, 12, 13,15 and everything beyond fifteen are responses) from JMP to excel. After export I cannot change the data type to continuous, its not available. I already changed everything to number formate and it didnt help.Its irritating for me also, that all the responses are continuous, even they come from the s...
I have a list of X and Y values that the user selects. I want those list values to populate the x and y axis in graph builder. Is this possible.? I continually get an error that the column names cannot be found?For example:x_values = {"x1", "x2", "x3"}y_values = {'y1", "y2", "y3"}I want the x axis to be the x_values and the y axis to be the y_values. This changes by how the user selects though so ...
Hi, I've been looking at this add-in which is very useful.https://community.jmp.com/t5/JMP-Add-Ins/Exploring-Model-Classification-Thresholds/ta-p/66964 In our case we don't have a probability but instead we have a status and a measurement that ranges between -10 and 10.I want to adapt the script so that the slider can move between -10 and 10 (I've already done it and it works). However the "Probab...
In GRaph Builder, "wrap" is a nice option to split a data set into small pieces and generate many sub-plots.
But sometimes, the window is just filles with the "titles" of the sub-plots an there is no space left for the plots.
Is there an option to hide the titles of the subplots?
In the "wrap" context menu, there is an option to remove the "title" (here: "data"), but not the sub-titles.
And in the red...
Hello Everyone, I am running a three-way ANOVA with data expressed in percentage, but the data set is not normal. Since I have zeros, I first add a constant 0.00001, then I fit the model, and in the least square fit window, I used the box cox transformation to do a better fit. I know if I ask to save the predicted values, it will save the back-transformed data, but is there an option for JMP to sa...
I'm using model screening and include XGBoost as a method. However the result from XGBoost are only shown in Train set and Validation set.Why the result of XGBoost for test set is not shown?
Hello JMP community members. Concerning the use of the Dantzig selector on big and sparse datasets.I wondered what features would be at disposal to tune the computational time.Right now it takes about 40 minutes to get a result back for a problem with 380 rows and 149 non-singular parameters. This makes me wonder about the options available to tweak the computation time. I was thinking about redu...
Jump into Graphing Date: Tuesday, September 16Time: 1:00 – 2:30 p.m. ETDuration:&nbs...
Elaborate on Elaborate: Advanced Interactive Reporting & AI-Enhanced Development In this...
Una introducción práctica para nuevos usuarios, usuarios con licencia de prueba o cualquier persona...
REGISTER HERE *** Note that this webinar starts at a different time than the other Fall 2025...