Distribute the JMP 16 software and license in a controlled fashion via SCCM software deployment
Anybody with some experience in distributing JMP Software to their users with the SCCM software deployment software
Find courses, tutorials, and lots of other methods of learning JMP.
view all learning resourcesAnybody with some experience in distributing JMP Software to their users with the SCCM software deployment software
Don't know how to title this but here goes. I have data sets with several time points per batch. For each batch I want to calculate the difference in results from time point zero. I used to compare each result to column min or max (as suitable) which worked fine, but when results are a bit jumpy, the max or min may happen at another time point than zero. I want the (desired) diff as below. Is ther...
],[
Thanks! t1=Regex(txt,"],[","\!n",globalreplace);//??
From a running script I would like to do a check if the script is encrytped or not. This is to seperate behavior between development versions and release versions of a script without having to change variables in the code. So something like:If( !Script is encrypted(),
//Do bit of code for development version
,
//Do bit of code for release version
)
One way is to check if the script starts with...
Using JMP 17.0, is there any way to see how it picked the effects it picked as active in the Fit Definitive Screening Report? For example, the Help file says in Stage 1 with fake factor or center point replicates, an estimator of error variance independent of the model is constructed. Main effects are tested against this estimate and those with p-values less than a threshold p-value are considere...
Anybody with some experience in distributing JMP Software to their users with the SCCM software deployment software
Using JMP 17.0, is there any way to see how it picked the effects it picked as active in the Fit Definitive Screening Report? For example, the Help file says in Stage 1 with fake factor or center point replicates, an estimator of error variance independent of the model is constructed. Main effects are tested against this estimate and those with p-values less than a threshold p-value are considere...
I would like to have parametrized Process capability, that is the process capability column will be changed by column switcher. However, the process capability analysis definition do not accept any parametrized value. In the following example, let's say the column switcher value is "d" which is a string "Displacement". The Process variables can be defined with Eval(d) without any issue, i.e., Proc...
how to run Spearman correlation adjusted with age by using JMP? Thanks, pls!
For my master's thesis on sleep apnoea, I would like to create a model. In a first step, I want to use nominal logistic regressions to see which parameters are significant. However, when running these regressions, I find interpreting the results difficult. Is there anyone who can help me with this?
The images below contain the outcome of
1) Nominal Logistic Fit Model of a categorical variable (knowl...
hi,I have got an add-in from https://community.jmp.com/t5/JMPer-Cable/Who-what-why-and-how-Tools-for-modeling-and-visualizing/bc-p/624293#M842 to implement floodlight analysis through Johnson-Neyman Plot. according to the table of the example from the linkage above; what does "_c" mean? such as "meaning_c" and overwhelming_c"? focus on my own study, I got a moderator called "SE" which is a contin...
Which GoF statistic is best to use (Pearson or Deviance) when the results disagree? Is one better suited for Probit than the other? I'm using JMP Pro 17.0.0
The context of my data is from an e-commerce website. I am measuring the number of errors made based on different independent variables: Filtering technique (Alphabetical, Relevance and Search) and Number of Items added (Add one at a time, or add multiple items to cart at once). As the number of errors made is 0 most of the time, I have opted to use the Zero Inflated Poisson Regression. When I per...
I am looking for an example of how to connect to oracle data with JMP 16 via oci. I have seen notes indicating that it is a far faster connection.
Bonjour à tous,Est-il possible de mettre dans le criblage des processus le format/la colonne de notre choix dans le module « dernière alarme ». Pour ma part j’aimerais pouvoir y mettre une colonne Date pour pouvoir contrôler à quels jour interviennent mes dernières alarmes.Merci pour votre aide.
Una introducción práctica para nuevos usuarios, usuarios con licencia de prueba o cualquier persona...
REGISTER HERE *** Note that this webinar starts at a different time than the other Fall 2025...
Jump into Graphing Date: Wednesday, September 24Time: 1:00 – 2:30 p.m. ETDura...
German Mastering JMP Webinar Finden Sie heraus, wie Sie Analyseschritte interaktiv automatisi...