cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • JMP will suspend normal business operations for our Winter Holiday beginning on Wednesday, Dec. 24, 2025, at 5:00 p.m. ET (2:00 p.m. ET for JMP Accounts Receivable).
    Regular business hours will resume at 9:00 a.m. EST on Friday, Jan. 2, 2026.
  • We’re retiring the File Exchange at the end of this year. The JMP Marketplace is now your destination for add-ins and extensions.
JMP Bar Chart

Welcome to the JMP User Community!

Ask questions, get answers, meet other JMP users

Learning Resources

Latest Discussions

  • PLOT ZOOM into X-AXIS

    When i doing variability plot, because of too many variables, the X-axis are squeezed together with invisible to see the wording. How i able to zoom in to X-axis bar to see what is the wording? I try to use the magnifier glass, but it only allow me to zoom in and out of the Y-axis, not the X-axis bar. Please advise. Thanks  

    OneNorthJMP OneNorthJMP
    Discussions |
    Oct 23, 2019 6:22 AM
    8298 views | 10 replies
  • Multiple Find and Replace Formula

    I am trying to take a company name like ABP MEAT DISTRIBUTORS, INC. and do some Find and Replaces.  I would like to Find ".", ",", and "INC" and replace with blanks.   The substitute formula only seem to work for 1 character.  How can I do multiple Find and Replaces?

    progers2020 progers2020
    Discussions |
    Oct 23, 2019 6:08 AM
    4677 views | 4 replies
  • Combinations

    Hello, I just want to ask how do i generate  6 random numbers ranging from 1 to 100 from which the user indicates the number of combinations to be generated? 

    pawndreal_ pawndreal_
    Discussions |
    Oct 23, 2019 5:49 AM
    3285 views | 3 replies
  • Choice DOE with alternative-specific factors and factors that affect all alternatives simultaneously

    Hi there, I'm designing a survey where people need to choose one of three transportation alternatives. Here are the alternatives, their specific factors and the number of levels I intend to use for eachMode A:Fixed cost: 3 levels: $10.00, $15.00, $20.00Variable cost: 3 levels: $0.25, $0.50, $0.75No waiting timeMode B:Fixed cost: 3 levels: $5.00, $15.00, $30.00Variable cost: 3 levels: $0.25, $0.50,...

    phildias phildias
    Discussions |
    Oct 22, 2019 10:44 AM
    13588 views | 10 replies
  • Graph Builder

    Hi, im new to the jmp scripting language. The code below works(it shows bar graphs of the column 3 to n) but there is one thing i'd want to do. How do i script such that my output should be a stacked bar chart of all columns?  for(i=3,i<=NItems(colList2),i++,gb= dt4 << Graph Builder(       Size(534,454),       Show Control Panel(0),       Variables(              X(:Label),Y(eval(Column(dt4,colList...

    skyzvoir0001 skyzvoir0001
    Discussions |
    Oct 22, 2019 7:56 AM
    5253 views | 3 replies

Latest Discussions

Latest Discussions

  • Send Expects Scriptable Object in access or evaluation of 'Send' Error

    I create a new window with variability chart, and put into journal. After that i want to save into pdf. But at the last line to save into PDF, it give me error like below. and nothing is saved into pdf. Need some advice which part i am doing wrong?  ErrorSend Expects Scriptable Object in access or evaluation of 'Send' , report_R235 << /*###*/SavePDF( "C:\LimTY\NXP\Product\Pegasus\Characterization\...

    OneNorthJMP OneNorthJMP
    Discussions |
    Oct 10, 2019 8:43 PM
    1432 views | 0 replies
  • How to Add Profit Matrix to Neural Net Confusion Matrix

    Hi all, I'm using a neural net to predict whether or not a customer will prefer to buy retail items at a markdown or if they are likely to buy full-price (i.e., "bargain buyers" vs. traditional shoppers). I'd like to incoporate the opportunity cost of a false positive (giving discounts to what would otherwise be a full-price shopper) using a profit matrix, but changing values on the matrix in the ...

    GhostBen GhostBen
    Discussions |
    Aug 5, 2019 8:00 PM
    1505 views | 0 replies
  • Capability Animation - How to see the LSL/USL Value?

    I just discovered this nifty tool called the Capability Animation, where you can play around, dragging the spec limits and mean shifts, and it simulates your capability indices. But, I cannot see the actual LSL/USL values as I drag them! Does anyone know how to make this happen?

    Antonio80 Antonio80
    Discussions |
    Jul 9, 2019 1:31 AM
    1478 views | 0 replies
  • Unable to allocate enough memory in access or evaluation

    Hi,I'm trying to use the Multivariate platform to perform a correlation between 6 time points (rows) across 73500 columns. My final goal is to output a  73500x73500 correlation matrix. When I try to run it, I immediately receive this pop out message:Unable to allocate enough memory in access or evaluation of 'List' , {/*###*/Estimation Method( 0 ), Matrix Format( 2 )} What's the issue? I'm using J...

    ns ns
    Discussions |
    Jul 8, 2019 9:04 AM
    1550 views | 0 replies
  • How to Post JSON data to a site via API functionality: "Unsupported Media Type"

    Hi There, I am trying to perform a POST request to post some JSON data to a server, but unfortunately as of now I keep getting a 415 error. The goal of this script is to upload a JSON formatted file (or something of the like) to the server for other users to download/read. I noticed that there are very few POST examples with JSL, but quite the abundance with GET, which I have no problems with. I w...

    liqinglei419 liqinglei419
    Discussions |
    Jul 2, 2019 6:33 AM
    1883 views | 0 replies
view all discussions