cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • JMP will suspend normal business operations for our Winter Holiday beginning on Wednesday, Dec. 24, 2025, at 5:00 p.m. ET (2:00 p.m. ET for JMP Accounts Receivable).
    Regular business hours will resume at 9:00 a.m. EST on Friday, Jan. 2, 2026.
  • We’re retiring the File Exchange at the end of this year. The JMP Marketplace is now your destination for add-ins and extensions.
JMP Bar Chart

Welcome to the JMP User Community!

Ask questions, get answers, meet other JMP users

Learning Resources

Latest Discussions

  • How to show different color with another column for the plot that has Overlay by other column

    Hi Dear JMP community,   Could you please help with it? Really appreciate it!   This is the data table, which concatenated by different SN, and I am going to see the difference of the result of curve plot by Force and Distance between different SN. 1st step:"Distance" vs "Force" step 2: overlay by "SN" to see the curve for each SN step 3 (the issue I am facing): color by "result" to see the sta...

    N1ck N1ck
    Discussions |
    Jun 8, 2025 12:05 AM
    389 views | 1 replies
  • Highlighting better data in a graph

      Hello  One feature I really appreciate in JMP is the ability to highlight data in the data table and instantly locate those points in a graph (e.g., in Graph Builder). It's a powerful way to explore and interact with the data. However, when working with large datasets, I often find it difficult to see the highlighted points in the graph. Even on a large screen, the selected data points are bare...

    jmit jmit
    Discussions |
    Jun 7, 2025 2:26 PM
    1186 views | 4 replies
  • All pairs, Tukey HSD graph builder

    Hey @everyone, Does anyone have a script to take data from the Fit Y by X analysis tool and add the connected letters report to the table itself?I am doing this manually in powerpoint, but I have a lot of data to analyse, so any tip or trick would help.Thanks I am looking for a result that looks like this, or close.This was generated by adding the letters one by one onto the graphs, but it is not ...

    ropeburn007 ropeburn007
    Discussions |
    Jun 5, 2025 8:11 AM
    1987 views | 4 replies
  • Graphique

    Bonjour à tous,   Dans un graphique j'aimerais pouvoir afficher que les 3 premiers éléments selon un critère de pourcentage -> afficher que les 3 items avec le pourcentage le plus élevé par quarter :   Vous trouverez la base de données en pièce-jointe.      

    hcarr01 hcarr01
    Discussions |
    Jun 5, 2025 8:03 AM
    1006 views | 4 replies
  • Extracting many linear regression fits (including confidence intervals) without using scripting

    Hi, I am looking for a way to easily obtain the slope of a regression fit and its 90 or 95% confidence intervals, without using JSL/scripting. My current experimental design looks a bit like this:
    outcome measure (4 different measures, on the same y-axis/scale, let's call them concentration 1-4)x-axis measure: time in daysgrouped by:production type (2 factors)temperature (2 factors)production site ...

    PedeGe PedeGe
    Discussions |
    Jun 5, 2025 7:15 AM
    4259 views | 3 replies

Latest Discussions

  • How to show different color with another column for the plot that has Overlay by other column

    Hi Dear JMP community,   Could you please help with it? Really appreciate it!   This is the data table, which concatenated by different SN, and I am going to see the difference of the result of curve plot by Force and Distance between different SN. 1st step:"Distance" vs "Force" step 2: overlay by "SN" to see the curve for each SN step 3 (the issue I am facing): color by "result" to see the sta...

    N1ck N1ck
    Discussions |
    Jun 8, 2025 12:05 AM
    389 views | 1 replies
  • All pairs, Tukey HSD graph builder

    Hey @everyone, Does anyone have a script to take data from the Fit Y by X analysis tool and add the connected letters report to the table itself?I am doing this manually in powerpoint, but I have a lot of data to analyse, so any tip or trick would help.Thanks I am looking for a result that looks like this, or close.This was generated by adding the letters one by one onto the graphs, but it is not ...

    ropeburn007 ropeburn007
    Discussions |
    Jun 5, 2025 8:11 AM
    1987 views | 4 replies
  • Need to generate a similar graph as attached

    I need to create a graph with the table attached to it as shown in the image

    kishanpatil kishanpatil
    Discussions |
    Jun 5, 2025 5:39 AM
    725 views | 2 replies
  • Adding column property units to Table headings

    Hello All,   I have a JMP file with multiple columns for different analytical assays each with the column property units. When I use tabulate to create a table and selecting the columns I get the column name but not the units. I don't want to add the units into the column titles themselves as that will effect a lot of other scripts I have. I did try just changing the statistics label to the assay ...

    Katz0801 Katz0801
    Discussions |
    Jun 3, 2025 6:33 AM
    724 views | 2 replies
  • Dario Schiraldi : How can I use JMP to analyze and integrate travel data from different sources into my website?

    Hello everyone,
    I’m Dario Schiraldi, CEO of Travel Works from Dubai. I’m looking to use JMP to analyze and integrate travel data from multiple sources like flights, hotels, and car, rentals into my website to enhance my online business presence. Can anyone suggest the best approach or tools within JMP to integrate these different data sources efficiently? I’m eager to learn how to use JMP for bette...

    darioschiraldi1 darioschiraldi1
    Discussions |
    May 30, 2025 2:44 AM
    918 views | 4 replies

Latest Discussions

  • Streamlining Data Workflows With JMP & MATLAB

    Integrating tools like JMP and MATLAB offers a streamlined approach to engineering analysis, making workflows more efficient and reducing the need for redundant script rewriting. By leveraging JMP’s powerful data analysis and visualization capabilities alongside MATLAB’s robust computational tools, engineers can seamlessly combine the strengths of both platforms. This integration allows for the ra...

    brycerjs8 brycerjs8
    Discussions |
    Feb 18, 2025 7:07 AM
    577 views | 0 replies
  • How to adjust the size of R plot imported with get R graphics(); ?

    I'm trying to run R code in JMP to create a plot. I succeeded in importing the plot in png format, but failed to adjust the size of the plot. I can adjust the "plot_from_R" in png format with the set size(); function in jsl, but it is not proportional and distorted. How can I import plot_from_R in the size I want?   R Init(); R Submit( "\[ windows(300,100) #it doesn't work plot(function(x) dnorm(...

    CountableModel1 CountableModel1
    Discussions |
    Jan 15, 2025 4:01 PM
    611 views | 0 replies
  • Sample size for Reliability Life Test

    I have used the interval explorer for parametric reliability life test planning for sample size calculation of accelerated life test. Please can someone confirm if the sample size returned is the total sample size or sample size per stress levels? Assuming I have 3 temperature levels, do I use 75 samples per temperature level or 25?

    EngrAkin EngrAkin
    Discussions |
    Dec 11, 2024 7:11 AM
    686 views | 0 replies
  • Optimizing Enterprise Server Connections in JMP Live

    Hello JMP Community,I’ve recently started using JMP Live to share and collaborate on statistical analyses with my team, and I’m encountering some challenges managing connections to our enterprise server. Our organization uses a centralized server to store and process data, and while the integration with JMP Live is robust, we’ve experienced occasional delays when syncing large datasets or during s...

    Harry_Cmary Harry_Cmary
    Discussions |
    Dec 9, 2024 10:03 PM
    603 views | 0 replies
  • Copy xy plots becomes very slow

    I tried to copy a group of xy plots, it got stuck forever. I am aware that the time it takes to copy is proportional to the amount of data points. But this is the first time I had something never finished. Is there a way I can get this copy job done? Thank you!

    FrequencyMining FrequencyMining
    Discussions |
    Dec 2, 2024 10:58 AM
    677 views | 0 replies
view all discussions