Set constraint of two factors in Custom DOE
I have 5 continuous factors. The sum of the values of 2 factors always has to be 100. Should I only enter 1 of these 2 factors in the design and constrain it in the range of 0-100? Or is there a way to add both factors and set a constraint for their sum to be 100 in Custom DOE?