Welcome to the JMP User Community!
Ask questions, get answers, meet other JMP usersLearning Resources
Find courses, tutorials, and lots of other methods of learning JMP.
view all learning resourcesLatest Discussions
-
Custom DOE - factor levels
I want to create a custom DOE. I have 1 discrete numeric vatiable with 3 levels (1,2,3). I have 2 covariate factors. I also has 1 continuous variable. The problem is I want the DOE with 5 levels for the continuous factor and JMP is only allowing me 2 levels. Am I doing something wrong when I specify the continuous variable or am I limited to just 2 levels?
jjhartwi
2823 views | 2 replies -
Calling a JMP Add-in Menu Item from within the Add-In
My apologies if this is a question with a trivial answer. I've written a JMP add-in which contains an assortment of scripts, all of which are referenced by menu items (for example) "Program A", "Program B", "Program C" etc. I want to be able to run the script referenced by menu item "Program B" via a command contained within the script called by menu item "Program A". Can that be done? Note that I...
DMR
5196 views | 3 replies -
Splitting a data table by column id
Hello, I have a large data table that the columns have an ID number followed by words like below, 1-Date1-parameter1-something2-something2-Date2-parameter3-parameter3-Date3-something3-else My ultimate goal is to automate control charts with Date as the sample label. There are not uniform amounts of columns for each ID and they are not sorted by ascending date. My idea is to sp...
CharlesIII
3346 views | 3 replies -
Adding up all the columns with names stored in a list
I have create a list of column containing roughly the same name below: Xlist = {};
Ylist = {};for(i = 1, i < ncols(dt2), i++,
if(
contains(dt2:i<< get name, "XXX") > 0, insert into(Xlist, dt2:i<< get name),
contains(dt2:i<< get name, "YYY") > 0, insert into(Ylist, dt2:i<< get name),
)
); I would like to create a new column which will give me a sum of the Xcolumn and Ycolumn. It is not working well for m...nguyendv06
8850 views | 2 replies -
how to get a sum of all columns with names stored in a list
I have create a list of column containing roughly the same name below:
Xlist = {}; Ylist = {}; for(i = 1, i < ncols(dt2), i++, if( contains(dt2:i<< get name, "XXX") > 0, insert into(Xlist, dt2:i<< get name), contains(dt2:i<< get name, "YYY") > 0, insert into(Ylist, dt2:i<< get name), ) );
I would like to create a new column as below which will give me a sum of the Xcolumn and Ycolumn. It is not ...nguyendv06
7596 views | 1 replies
Latest Discussions
-
Custom DOE - factor levels
I want to create a custom DOE. I have 1 discrete numeric vatiable with 3 levels (1,2,3). I have 2 covariate factors. I also has 1 continuous variable. The problem is I want the DOE with 5 levels for the continuous factor and JMP is only allowing me 2 levels. Am I doing something wrong when I specify the continuous variable or am I limited to just 2 levels?
jjhartwi
2823 views | 2 replies -
Splitting a data table by column id
Hello, I have a large data table that the columns have an ID number followed by words like below, 1-Date1-parameter1-something2-something2-Date2-parameter3-parameter3-Date3-something3-else My ultimate goal is to automate control charts with Date as the sample label. There are not uniform amounts of columns for each ID and they are not sorted by ascending date. My idea is to sp...
CharlesIII
3346 views | 3 replies -
JSL Check Box Set Size
Hello JMP folk, Is it possible to change the size of a Check Box by script? Looking through the documentation I set the max size before changing the Height & Width but I have still not been able to increase the checkbox size. Have not found any other topics on this in the forum.
windowMain = New Window( "test", //Header Outline Box( "", H List Box( Check Box( "", << Set Max Size(30,30),
...RBILLC
10264 views | 6 replies -
Running Multivariate analysis
Hi, I'm trying to run a few analysis but can't seem to figure my way around JMP to set-up and produce any kind of results. I'm a graduate student in California. What I know I need to run is:1) MANOVA - where I am trying to find differences in 4 variables between 4 groups.2) Multivariate t-test: I have 2 variables, that are related, and find differences between two groups over time. A little backgr...
E_Dandekar
5112 views | 3 replies -
Graph Builder - Change the Drawing Order when using a Group Y variable
Hello everybody, I would like to know how we can uniformize the customization of graphical elements when we use a Grouping column. Let's take an exemple using the Big Class.jmp table.I choose "height" as Y variable and "age" as Group Y variable. I display the histogram in addition to the points.After that, I change the order of elements using the Customize menu so that points are now over histogra...
anne_sa
3527 views | 4 replies
Latest Discussions
-
repeated-measures ANCOVA: How to perform the analysis when the parallel slope assumpt. doesn't meet?
Hi all,I need to perform the ANCOVA for a repeated-measures design. I tried to adapt the Julian's ANCOVA procedure showed on the https://www.youtube.com/watch?v=mApbp1RDy-U to my study case (repeated-measures design). Initially, I did the following actions: 1. In the Fit Y by X dialogue: I selected VAR_Y as "Y, Response" and VAR_X as "X, Factor";2. For "Group by" I selected the variable Timepoint;...
Reinaldo
2995 views | 0 replies -
Time Series - Prewhiten
Hello Everyone, My question pertains to understanding what the terminology in JMP's prewhiten platform means.Also, understanding how that helps me determine an appropriate Transfer Function that I can use to test whether x causes y. JMP's prewhiten output shows three different ACF's labeled "Prewhiten Corr", "Noise AutoCorr", & "Noise Partial AutoCorr".
What is the Prewhiten Corr, Noise AutoCorr, &...nopon649
2117 views | 0 replies -
Fit Spline By Group: Save Spline Coefficients to Column?
Hi all--having an issue. I am using Fit Y by X to fit 5,000 separate regressions. I hold control, select red drop-down arrow, and Fit->Flexible, Fit->Spline and select, say, 0.1. This fits a spline to all 5,000 graphs with lambda of 0.1. I have 28 X values in each of 5,000 graphs, and I understand there are 4 different spline coefficients (A, B, C, D). I understand if I just had 1 regression...
M0gAl0g
2604 views | 0 replies -
Why does Profiler not stop
All,
I have a script I am trying to profile and improve on. When I run the script without the profiler, it runs and ends within 4 minutes. When I try to profile the script, even after a good 5-6 minutes, it does not stop. Wondering why this is happening and if there is a way to use profiler and not run into this. I am using JMP 13.uday_guntupalli
1585 views | 0 replies -
P value, L-R Chi Square, Prob Chi Square in Choice results
Hello everybodyI am going to undrestand the P value, L-R Chi Square, Prob Chi Square in Choice results. But different interpretations of these values can be found in the web. It seems that the true interpretation is related to null hypothesis and confidence intervel.The results of the study are as the attached pictures.Could any body inform me what exactly these statistics are saying and base on w...
aryasohrabi
3588 views | 0 replies
JMP Events
-
ChinaShanghai May 29
-
1:00PM - 2:30PM EDTApr 16Jump into DOE: Hands-on Workshop
Jump into DOE Wednesday, April 16 | Live Web Workshop1:00 p.m. – 2:30 p.m. ET Hosted via Zoom...
-
12:00PM - 1:00PM EDTApr 17JMP for Teaching Statistics in Semiconductor Engineering Education
REGISTER HERE: https://www.jmp.com/en_us/events/live-webinars/academic/jmp-for-teaching-stat-semicon...
-
1:00PM - 2:00PM EDTApr 25Getting Started with JMP
New JMP users will learn how to: Easily navigate JMP using the JMP Starter. Import all types o...
-
3:00PM - 4:00PM CESTApr 30Scripters Club: Is Your SPC Doing Well?
Is Your SPC Doing Well? Presenter: Georg Raming (Siltronic) Would you like to keep an eye on many SP...