Hi
A lot of semiconductor equipment produces .csv files for data recorded during processing: a processed batch number containing 1 to  X silicon wafers,
The tool will run same process steps repeating on up to X wafers. CSV file  shows processed steps repeating but no assignment of  the wafer run order.  So if we have mutiple csv files imported to JMP then want a formula in the column to auto assign wafer run order; wafer run order will not always be same number of wafers that will vary...
Ideally a formula would be useful.....so we have batch number and process steps in CSV file.
Anyone done this...?. 
 
BATCH NUMBER        WAFER RUN ORDER        PROCESS STEPS