cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Don’t miss your chance to experience Discovery Summit Europe at our best available rate! Early bird registration through 31 Oct.
  • Image to Table JMP extension imports single or batch images as data tables. Useful to extract curves from pictures or convert image data to curve data to use in analyses like Functional Data Explorer. Download and install the extension.

Discussions

Solve problems, and share tips and tricks with other JMP users.
Choose Language Hide Translation Bar
scottrubel0
Level I

M-charts for failure frequency

We have a production process with very low (ppm-ish) fail rates that we would like to monitor for fails.  Rather than monitoring ppm fail rates, it is a stronger test to monitor the number of fails (or time) between them, under the assumption that they follow a binomial distribution. In an M chart (this is what we call it) you then calculate a Z score every time there is a fail and chart as usual.  It's not clear that JMP has this capability, but maybe it exists under a different name.  Can anyone comment?  We are using JMP 15.2 Pro.

3 REPLIES 3

Re: M-charts for failure frequency

Click the Shewhart Variables button in the control panel on the left side of Control Chart Builder and select Rare Event. You can make a G-chart (negative binomial distribution model) or a T-chart (Weibull distribution model).

scottrubel0
Level I

Re: M-charts for failure frequency

Thanks Mark.  Unfortunately that doesn't seem to quite be what I need.  I can pre-process my data to convert from PPFPPPPPFPPF, etc. into counts of # of passes between each fail, and that has a negative binomial distribution.  The strategy you recommend seems to calculate limits based on the percentile points of the observed distributions.  However for a control chart I need to put in control limits based on a maximum allowed success (=Fail) probability (e.g., 1 ppm), rather than what is observed in the sample.  Our general methodology is to map the binomial percentile to a z score using the inverse normal CDF, so that a value of -3 is a good lower limit; using that approach my data set averages around z = -4.7.  The lower limit on the JMP chart is 0 however, which is essentially z = -INF.  Do you have any recommendations?

Re: M-charts for failure frequency

You can right-click on the chart and select Limits > Set Control Limits. You can now enter your pre-determined limits this way.

Recommended Articles