I am trying to build control charts that have some data points appear with an outline. I have already tried the following:
1. I have read and followed the JMP help articles on Markers and I am able to achieve this for other plot types (i.e. bivariate) but not for control charts. The same steps do not work for control charts.
2. I have also tried to use the following command in my script instead of GUI: Marker Drawing Mode( "Outlined" ). It has no effect.
3. I've also tried to adjust Graph preferences so I can select the markers and have them appear as outlined while selected. This also does not work on a control chart.
I'm starting to wonder if it's not possible to have outlined markers in JMP when using control charts. Has anyone else encountered this?