I have a detailed formula in my JMP table I need to optimize. I'll need to incrementally vary 3 inputs and let the rest be optimized.
Is there a way to lock and change the three variables, optimize the others, and save the results for hundreds or thousands of options?
I can do this manually in the prediction profiler, but it becomes unmanageable for the number of cases I'll need.
Thanks!