How can I add extra runs into the designed runs from Definitive Screening Design?
Dear JMP experts, I am Chau Dang, and new to JMP. I used JMP to make design for my experiments. I selected a Definitive Screening Design (DSD) with 6 variables to create 17 runs for my experimental set. During the time of conducting the experiments, I made 7 extra runs (not designed by DSD) with the same variables. In the end, I want to analyze the results from 17 runs (from DSD) and 7 extra runs...