Best use of DOE Run Budget in Screening Design
I'm looking for some guidance from the group. I am preparing an example to use in training with Custom Design. I want to demonstrate a screening design with 5 continuous factors. I have a run budget of 15 runs. Using custom design main effects model with 12 runs (assuming default signal to noise assumptions) I get a power of 0.821 My question is about the best way to use the extra 3 runs Do I run ...