hour axis
hi,
Maybe a basic issue but in graph builder (JMP14.2) I can't create an axis which will range from 6am (min) to 02am (max)the following day. When I try to set the minimum value at 06:00 and the maximum at 02:00 the axis immediately switches the min and max.
I need the events which occured after midnight to apear higher i.e. later in the time period, but they always apear below - lower on the scale. What am I doing wrong?
Thanks
Eran
Accepted Solutions
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
Hi Eran,
Sounds you need to add the date as well.
Or use Column Property "Value Ordering" to set up a specific order of values.
If you don't succeed, please attach the data.
Regards,
Tom Abramov.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
Hi Eran,
Sounds you need to add the date as well.
Or use Column Property "Value Ordering" to set up a specific order of values.
If you don't succeed, please attach the data.
Regards,
Tom Abramov.
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
I thought about that but each data point (There are more than a 1000) has a different date – I am interested in the hour distribution over the day
[cid:image001.png@01D59ADC.D345D770]
The small groups on the bottom should be on top of the graph. Adding the date to each point would make it an impossible.
[cid:image002.png@01D59ADC.D345D770]
eran
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
Hi tom,
Thanks - I think the value ordering did the trick - was a bit lengthy but the final result seems ok
eran
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Get Direct Link
- Report Inappropriate Content
Re: hour axis
There is another trick (maybe for future cases) - choose column property "Row order levels". The values will be ordered in charts as they are ordered in the table.