cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
The Discovery Summit 2025 Call for Content is open! Submit an abstract today to present at our premier analytics conference.
Get the free JMP Student Edition for qualified students and instructors at degree granting institutions.
Choose Language Hide Translation Bar
View Original Published Thread

Run Charts

Steven_Moore
Level VI

Perhaps I am missing something in the Run Chart platform?  After producing a run chart, where is the analysis such as tests for clusters, trends, mixtures, oscillation, etc (with p-values).?

Steve
1 REPLY 1


Re: Run Charts

I just had a customer ask me this same question - overall in JMP we use Westguard and Western Electric rules and circle the points rather than use general p-values like Minitab. Test info is further down in this post.

 

Control charts can be done in the Control Chart Builder (Analyze -> Quality and Process -> Control Chart Builder). This is an interactive drag and drop control charting platform. There is a control panel on the left that will let us control different aspects of what we see, for example individual points versus the mean per x grouping variable.
 
The documentation goes through a few examples:
 
Here’s a description of the charts available:
and also here:
 
JMP uses Western Electric/Nelson rules (Test 1-8), testing beyond limits, and Westguard rules - the points that trigger these alerts are circled. Tests are described fairly well. So rather than getting just a p-vlaue like in Minitab, you will see the points circled with the test beside it. 
 
Also, we can create custom tests, for example:
 
Here are a few resources to help you use JMP:
Online documentation: (also built in under the help menu): http://www.jmp.com/support/help/13/Control_Chart_Builder.shtml#
Learning Library - short 1 page pdfs and videos: https://www.jmp.com/en_us/learning-library/quality-and-process.html
 
This is a general guide for moving to JMP from Minitab: