cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • New to JMP? Join us Sept. 23-24 for the Early User Edition of Discovery Summit, tailor-made for new users. Register now for free!
  • Your voice matters! Tell us how you prefer to receive JMP updates, so we can tailor our communication to your needs. Take short survey.
  • See how to access JMP Marketplace - and - find, create & share add-ins to extend your JMP. Watch video.

Discussions

Solve problems, and share tips and tricks with other JMP users.
Choose Language Hide Translation Bar
David_J
Level I

Making a Mixture Design that Does Not Sum to 1.0

I am trying to make an I-optimal mixture design with 3 components that add to 0.883, with the remainder 0.117 being a fourth, but constant, ingredient. I know a possible work around is to normalize my constraints, but to avoid confusion in reporting the information I would like to have the three components add to 0.883. I have tried to add linear constraints (shown in the attached screen shot) but I get an error. Please advise.

David_J_0-1616101681146.pngDavid_J_1-1616101707201.png

 

 

1 ACCEPTED SOLUTION

Accepted Solutions

Re: Making a Mixture Design that Does Not Sum to 1.0

There is a better way than using constraints.

From the red popup triangle by Custom Design choose Advanced Options > Mixture Sum and specify your sum of 0.883.

 

Dan Obermiller

View solution in original post

2 REPLIES 2

Re: Making a Mixture Design that Does Not Sum to 1.0

There is a better way than using constraints.

From the red popup triangle by Custom Design choose Advanced Options > Mixture Sum and specify your sum of 0.883.

 

Dan Obermiller
David_J
Level I

Re: Making a Mixture Design that Does Not Sum to 1.0

Dan, thank you for the insight. I was wondering where that particular function was. This helps me tremendously. 