cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
The Discovery Summit 2025 Call for Content is open! Submit an abstract today to present at our premier analytics conference.
Get the free JMP Student Edition for qualified students and instructors at degree granting institutions.

How to change order on a "compare means" chart

CriticalDoe368
Level I

Hey everyone, 

 

Im trying to change the order on a Tukey-Kramer compare means chart and cannot figure out how.

Our response variable is a swell property, where lower swell is desired. How do I get my charts to show the lowest values at the top and largest at the bottom (specifically for a connecting letters report)? I've tried hitting 'reverse' on the value order on the columns of said variable, to no avail

 

Thanks

1 REPLY 1

Re: How to change order on a "compare means" chart

Right-click on the Connecting Letters Report table and choose Sort by Column. Choose the Mean column and check the Ascending checkbox.

Here is what a sorted report looks like on a sample dataset.

 

Dan_Obermiller_0-1655230281536.png

 

Dan Obermiller