cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Try the Materials Informatics Toolkit, which is designed to easily handle SMILES data. This and other helpful add-ins are available in the JMP® Marketplace
Choose Language Hide Translation Bar
The_Annie
Level II

Force Control Chart Limit at Zero

Hi.  I have some data that is bound on the lower end by zero.  Is there a way to force Jmp to make the lower control limit zero?

Thanks!

1 ACCEPTED SOLUTION

Accepted Solutions
txnelson
Super User

Re: Force Control Chart Limit at Zero

If you set the LCL to zero in the Control Limits Column Property, JMP will use that limit in charting.

Right click on the column header and select

      Column Properties=>Control Limits

Jim

View solution in original post

2 REPLIES 2
txnelson
Super User

Re: Force Control Chart Limit at Zero

If you set the LCL to zero in the Control Limits Column Property, JMP will use that limit in charting.

Right click on the column header and select

      Column Properties=>Control Limits

Jim
The_Annie
Level II

Re: Force Control Chart Limit at Zero

Thankyou!  I knew it had to be in there somewhere.