Do you convert your accelrated data points (0 ,1,2,3) into their respective room temperature time points (0,8,16,24) when performing shelf life analysis using Analysis/Reliability and Survival/Degredation/Stability?
Go to Solution
yes!
With the time in units, then the predicted crossing times are in the same time units.
Chers,
B
View solution in original post