Share your ideas for the JMP Scripting Unsession at Discovery Summit by September 17th. We hope to see you there!
Choose Language Hide Translation Bar
Highlighted
BrianK
Level I

CUSUM Control Chart

hi guys,

 

If I take the data set from the sample data library "Engine Temperature Sensor.jmp." and run the script below, I detect a shift at datapoint 26. What I would like to do is to modify the script below,so upon a shift detection only, it would automatically do something (example trigger an email, or write to a file ) flagging a shift was detected and on which data point the shift occurred? 

 

Any ideas on how to achieve this?

 

Thanks

 

Brian..

 

CUSUM Control Chart(
Y( :Y ),
Sigma( 5 ),
SendToReport(
Dispatch(
{"CUSUM Chart"},
"2",
ScaleBox,
{Min( -10 ), Max( 10 ), Inc( 5 ), Minor Ticks( 1 )}
),
Dispatch(
{"CUSUM Chart"},
"CUSUM Control Chart Plot",
FrameBox,
{Frame Size( 1136, 644 )}
)
)
);

1 REPLY 1
Highlighted
Byron_JMP
Staff

Re: CUSUM Control Chart

Challenge Accepted

 

I wonder if its possible to use the standard control chart alarm scripts to catch the flag and then launch an action?

Maybe...

JMP Systems Engineer, Pharm and BioPharm Sciences
Article Labels

    There are no labels assigned to this post.