How to get CV% for an unbalanced Precision study
Hello JMP community, I have some data for Precision study with an unbalanced design. As shown below, there are ten runs performed with reagent lot 2 and 3 on two instruments (A and B). The fully automated instrument has three docks (locations) for the 96-well plate. The same sample was tested with 3 replicates in each of the ten runs by one operator. The goal is to calculate CV% for intra-run, int...