In JMP 6 and later, the Levey-Jennings method has been added to the control chart menu.
In this control chart, the control limits are calculated using sigma as the standard deviation of the univariate distribution.
Note
For the formula for calculating σ for regular control charts, please refer to " How is Sigma (standard deviation) used in the Shewhart Control Chart calculated? "