cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
Choose Language Hide Translation Bar

Selecting out of control and out of spec rows

Two items for review:

  1. I would like to suggest that on the Process Screener platform, you add two options to the red arrow drop down: "select out of spec rows" and "select out of control rows".  When selected they would highlight the corresponding out of spec or out of control rows per the process screener analysis.  If both were selected it would be if it is out of control or out of spec the row would be selected.  The select out of spec option is currently available in the capability platform.
  2. I would like to suggest that the "select out of control rows" option be added to the red arrow drop down for the control chart builder platform

Thanks for considering these

 

Steve