Hi there
How do i fit a cLDA in JMP (via FIT command say) with the constraint that the group means are assumed to be equal at baseline (hence the “constrained” in cLDA). Hence if we had a model with Time and their interaction Group:Time as predictors theoretically this model structure would impose that the group means are equal at baseline (i think?).
In cLDA baseline means are constrained to be equal between the randomised groups; a common baseline mean is assumed and fit across randomised groups. Here is the cDLA model fitted in R..hence i am aiming to implement the cDLA model in JMP via FIT command if possible.
Using the FIT data~ time+group.time doesn't seem to impose the common baseline mean constraints.
Any advice on how to fit such models in JMP will be appreciated.
regards Vince