Try the Materials Informatics Toolkit, which is designed to easily handle SMILES data. This and other helpful add-ins are available in the JMP® Marketplace
Choose Language Hide Translation Bar
hogi
Level XII

No table linking after saving the project?

Hi,

when I generate a summary table with the option "link to original data table" (selected by default), the two tables are linked:

By selecting a row in the summary table the corresponding rows in the original table are selected.

Cool.

This also works for selections in Graphs and Dashboards.

Very cool!

 

Now my problem:

After saving both tables to a project file, (precisely: after close & re-open the project),  the link is not working anymore.

 

Is there a way to save the "link" when saving the data tables?

How to generate Dashboards that  rely on dynamic selection in linked data tables - ones that still work after save & re-open
Thanks.


jmp 16.02

0 REPLIES 0