I am running an EWMA control chart via Analyze > Quality and Process > Control Chart >> EWMA Control Chart. It appears that I am unable to add a title to the chart. I am also trying to set up a script. I have the basic code,
EWMA Control Chart( Y( :Thickness ), Subgroup( :Date ), Lambda Slider( 1 ) );
in place. Is there a way through either scripting or the above portal to add a title? Can an EWMA Control Chart be setup through the Control Chart Builder? I tried but unable to make it happen. Thank you.