Hello JMP community,
I have some data for Precision study with an unbalanced design. As shown below, there are ten runs performed with reagent lot 2 and 3 on two instruments (A and B). The fully automated instrument has three docks (locations) for the 96-well plate. The same sample was tested with 3 replicates in each of the ten runs by one operator. The goal is to calculate CV% for intra-run, inter-run, inter-lot, inter-instrument, inter-dock (plate location), and total CV%.
Below is the screenshot of the data in JMP. (The file can be found in the attachment. )
Below is what I did for the analysis. I selected "Crossed" for the Variability Model.
My questions are:
1. Is this the right way to analyze the data?
2. How to get the CV% for each factor based on REML Variance Components Estimates results?
3. Only Run and Run*Replicate showed some values under Var Component. The others are all 0. I feel this is not quite right. Something wrong here?
4. Since the design is not balanced, what else needs to be considered for the analysis to account for that?