Thanks for the help Phil!
So a follow up question.
I wanted to test how JMP handles uncontrolled variables in designing the DOE, so I went into custom design, loaded my factors, modeled the main effects, then added 2 uncontrolled factors. JMP then automatically added more runs I assume to account for the increased expected variability associated with having the uncontrolled factors. If I cannot perform set these as uncontrolled variables in the DSD, and therefore, JMP will not add runs, how can I ensure I will have enough runs to accurately model these factors?
Is it better to still proceed without these factors and retrospectively add the columns, or I could set them as controlled factors knowing I cannot meet the targets and then retrospectively add the data, or I can just add additional runs using the "number of extra runs" feature. What do you suggest?