Discovery Summit 2026: Early User Edition - September 23-24.Register. It's free.
Graph Builder Toolbar streamlines interactive graphing. Creates shortcuts on Report and GraphBuilder Helpers toolbars. Download and install the extension.
Graph Builder: how to change order of group x variables
Nov 3, 2018 02:28 PM(10804 views)
Hi everyone,
I'm trying to figure out if there is a way to reverse the order of the "group by x variables: high, low, natural" like is possible with the x and y axes.