Hi.
I'm not even sure this is the right place to ask, but here goes.
Right now I'm working with multiple regressions in JMP. I have Y as the abundance of bees in a certain area, and several X variables such a temperature, land use area, amount of flowers and so forth.
Right now I know the values of Y and X, and I'm trying to narrow the X variables down, so only 3-5 will remain as the significant variables determining bee-abundance.
Will I be able to, via JMP, to create a model where I'll be able to input new values and then get the corresponding Y (number of bees)? Say that I would like to examine the effect of a rise in temperature. I would like to be able to punch in the new temperature, and then get the new Y value. Sort of a prediction tool for bee abundance.
Hope this was clear enough.
Best Regards, Boll