cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
The Discovery Summit 2025 Call for Content is open! Submit an abstract today to present at our premier analytics conference.
Choose Language Hide Translation Bar

Customizing Graphs

Started ‎06-10-2020 by
Modified ‎12-03-2021 by
View Fullscreen Exit Fullscreen

Learn more in our free online course:
Statistical Thinking for Industrial Problem Solving

 

In this video, you learn how to customize graphics in Graph Builder with the file Process Yield.jmp. You see how to change titles and labels, change axes, add reference lines, customize legends, change colors, and annotate graphs.

 

This example involves the average monthly yield for two manufacturing processes, both before and after changing the supplier.

 

To start, we select Graph Builder from the Graph menu. Because we have time-ordered data, we’ll create a run chart.

 

To do this, we drag Month to the X zone, drag both Process 1 and Process 2 (at the same time) to the Y zone, and click the Line icon.

 

This creates run charts for both processes. Finally, we’ll click Done to close the control panel.

 

The percent yield is plotted on the Y axis, so we’ll click the Y-axis label and change it to % Yield.

 

We’ll also change the graph title to something more descriptive. To do this, we click the title and then enter the new name. We’ll title this graph Average % Yield.

 

The supplier was changed in July. We want to emphasize this change in the graph. We’ll add a reference line to note when this change occurred.

 

To do this, we double-click the X axis. The axis labels are assigned values for sequencing. The first value, Jan, is zero. July is the sixth value. To add a reference line for July, we enter 6 in the Value field. We’ll change the color and the line style, and click Add.

 

You can see what this reference line will look like in the preview pane at the bottom.

 

To make this change stand out even more, we’ll add shading for the period from July through December. To do this, we select Allow Ranges, enter 6 and 12 in the Min Value and Max Value fields, change the color to light gray, and click Add.

 

Let’s make a few more changes while we’re here.

 

The data are for January through December 2018. We’ll add 2018 to the end of the value labels for Jan and Dec. This is a convenient way to document the time frame for the data directly on the graph.

 

We’ll click OK to accept these .

 

You can see the changes we just made. We added a reference line at July, added shading from July through December, and changed the axis labels for January and December to note the year.

 

To make the supplier change stand out, we’ll add an annotation to the graph.

 

To do this, we click the Annotate icon from the toolbar, and click in the graph. We’ll add this annotation: July: New Raw Material Supplier.

 

Finally, let’s change the lines to make it easier to distinguish the lines for the two processes. We’ll right-click the legend for Process 2, give it a thicker line width, and change the line style to dashed.

 

We’ll also change the line thickness for the line for Process 1. But we’ll keep this a solid line.

 

Here is our final, customized graph with all of the details needed to interpret the run charts for the two processes before and after changing the supplier.

Comments
Ksenia

when I run an analysis and get graphs, they are impossible to use because they are very low quality. How can they be improved? 

hogi

you can go to the preferences and increase the resolution:

hogi_0-1740597192968.png

 

 

@Ksenia, ensure you're using vector graphic formats, such as emf on Windows or pdf on Mac. Raster formats, such as png and jpg, can become pixelated when increased in size, but vector formats do not have this problem.

 

When exporting images with File > Export, you'll find vector formats among the options. When copy-pasting into Word or Powerpoint, make sure to use the Paste Special option so that you can choose a vector format to be pasted. If you don't see a vector format in your options, you'll want to go to the JMP preferences (either the Windows or Mac OS preferences group, depending on your OS) and specify that your desired format be included on the clipboard when copying content inside of JMP.

 

You can learn more in this blog post: Getting High Quality Graphics Out of JMP.

 

That said, sometimes we may be forced to use a raster format (e.g., a file upload system accepts only png files), and in that case, hogi's recommendation regarding the DPI setting is a good one.

Ksenia

@Ross_Metusalem and @hogi, thank you both so much!