cancel
Showing results for 
Show  only  | Search instead for 
Did you mean: 
  • Register to attend Discovery Summit 2025 Online: Early Users Edition, Sept. 24-25.
  • New JMP features coming to desktops everywhere this September. Sign up to learn more at jmp.com/launch.
Choose Language Hide Translation Bar
Variables Control Charts – XBar & R/S Charts

This guide provides instructions for creating XBar & R or XBar & S control charts using the Control Chart Builder and the Control Chart platform. XBar & R or XBar & S control charts are used to monitor a continuous variable where the data is sampled with subgroups. 

 

XBar & R Charts – Control Chart Builder

  1. From an open JMP® data table, select Analyze > Quality and Process > Control Chart Builder.
  2. Drag a continuous variable from Select Columns (continuous variables have blue triangles), and drop it in the Y zone.  Here we used ‘Diameter’.
  3. Drag and drop a subgroup variable in the Subgroup zone (at the bottom).  Here we used ‘Day’. By default, JMP produces a control limit summaries table and two charts: XBar (subgroup average) and  Range (subgroup range). Right-click on the bottom graph and select Points > Statistic to change from a Range chart to an S Chart, and use Limits > Sigma to change the method for estimating the standard deviation.
  4. If available, drag and drop a variable in the Phase zone (top), and click the Done button when finished.  Here we used ‘Operator’.

XBar & R Charts – Control Chart Platform

  1. From an open JMP data table, select Analyze > Quality and Process > Control Chart > XBar Control Chart.
  2. Select one or more continuous variables from Select Columns, and click Process.   
  3. Enter the variable that defines the subgroup into the Subgroup role. Click OK.

Notes: Additional options, such as tests for special causes, are available from the red triangles in the Control Chart platform. Right-click on the graph in the Control Chart Builder for many of these same options.

 

Visit Quality and Process Methods > Control Chart Builder and Legacy Control Charts in JMP Help to learn more.

Recommended Articles