Executing a DOE 100 miles offshore on a moving vessel is rarely "textbook." When unverified epoxy coating threatened the integrity of a critical 4 million pound bolt connection, we faced a midnight decision: halt million-dollar-a-day operations or prove the system was safe.
Everything that could go wrong did. Initial testing suggested a special-cause wrench bias, only to discover a data-entry swap that reframed the crisis as high-scatter common-cause variation. As operational windows closed, our planned RSM DOE collapsed into a sparse comparative test. Working with non-ideal instruments amidst high winds and vessel heave, we implemented a "Master Bolt" for thermal drift compensation and an emergency MSA to validate our measurements.
When a wrench failure further corrupted our final run, we were left with imperfect, unbalanced data. Rather than relying on poor-fitting linear models, we leveraged JMP to build a digital twin reliability model. By integrating our field-derived preload distributions with high-fidelity load distributions from global riser analysis, we executed large-scale Monte Carlo simulations to evaluate the probability of flange separation. To ensure the integrity of the results, we analyzed the stability of the far-tail distributions using I and MR charts for convergence.
This session demonstrates how to maintain statistical rigor when "standard procedure" fails. We show how to transform sparse, messy field data into a probabilistic safety case, providing the engineering confidence required to continue critical subsea operations by coupling real-world "noise" with advanced structural simulations.

Starting now here. My name is David Skaarsjö. I'm a Principal Engineer at the company HMH. I'm working at our site in Macaé, Brazil.
My name is Magno Silva, Senior Equipment Engineer at Petrobras, and drilling riser analysis specialist.
We're going to take you here on a bit of a journey. Actually, it is a journey. We went 100 miles offshore off the coast of Brazil and built a reliability model for a bolted connection. We collaborated together, HMH and Petrobras. HMH is the OEM of the equipment that is concerning. Petrobras is the user of the equipment. When we built the reliability model, me, as an expert from HMH, were dealing with the resistance side of the reliability model while Magno was working on the load side.
First, we're going to start just introduce our companies very quickly. HMH is about 130 years old. We have a long history. We have been working, we are working with offshore drilling equipment, onshore drilling equipment, construction, and mining equipment. When it comes to drilling equipment, we have the full suite needed for offshore and onshore drilling. This presentation, particularly, is going to deal with the drilling riser, which is the piping system. Magno will explain a little bit more, that connects the drilling vessel to the seafloor.
Just a quick introduction here about Petrobras. Petrobras is the main oil operator in Brazil, responsible for the majority of oil and gas production in Brazil, responsible for exploration and production up to refinery, distribution, all downstream operation.
Starting here with the context here about this case, there was a planned critical offshore operations going to take place about 100 miles offshore on the coast of Brazil. The potential downtime cost here is about $1 million per day. That's the cost if production stops. We were collaborating, HMH and Petrobras, to do front-up checks of the equipment to ensure that the operation went as smooth as possible. During these initial reviews, we identified some gaps.
There was specifically one gap related to a calibration traceability for torque wrenches for a very critical bolt connection. We believed that everything was going to be fine. We didn't have any real reason to believe that something was wrong, but we didn't have the calibration certificate. There was not just enough time to send the wrenches onshore to do a proper calibration. The engineering question came up here, can we, by doing measurements and testing, demonstrate that the bolt preload is sufficient for the operational loads, and then, based on that, can we make a decision that the operation can proceed, or do we need to stop the operation and perform other mitigating actions? Magno, you can explain a little bit about the drilling riser, what that does.
Drilling riser column is a stack-up of riser joints, which is composed of a main pipe to conduct the fluids from the reservoir, drilling mud, and so on, and several peripheral lines with several purposes, for example, well control. Those pipes are attached together by a flange with several bolts, was studied during this investigation here.
Go ahead. Okay. When we talk about drilling riser, it's very important to understand that this is the main connection between the drilling unit and the wellhead system. In such scenarios, it's important to understand the loads that are being imparted in this structure. For example, the loads coming from the drilling vessel and also the loads from the ocean currents. The top tension is applied by the drilling vessel to keep this drilling column as straight as possible. Also, a tension…
We lost Magno here, but I'll take over here. The common output from the riser analysis is basically a load curve.
Exactly.
Where you can see the effective tension.
Exactly. This is effective tension being applied in the riser column of almost 10,000 feet long. We have a high value applied in the top by tensioner system, and then you decrease this tension along the riser structure as you have the submerged weight of this structure. It's a very important system in the drilling operation, so it's very critical to keep its integrity. It's a long system with high loads being imparted on it. This is our focus here in this investigation.
That was the load side from the reliability model. The resistance side is the product itself or the riser joint. This was, like Magno mentioned, a flanged riser joint, which is basically two flanges, and they are bolted together, but you're talking not your normal utility bolt here. We're talking about bolts in this case, it was almost four inches in diameter and half a meter long, so it's big bolts, and they carry an enormous tension to be able to keep this riser joint straight.
A bolt is, in principle, acting like a very, very stiff spring. You're applying torque to the bolt, and you're stretching out the whole body of the bolt. That is where this becomes challenging because you need to have enough stretch in the bolt so you keep the flanges bolted together under varying load. If you have too much tension in the bolt, you can overutilize the material, and you have another failure mode.
What we were looking at here was to, do we have sufficient tension in these bolts, and can it be cleared for the planned operation? I and Magno went offshore, we arrived to the rig. The first thing that we found out was that one of the assumptions that we had that everything is going to be fine was not really the case.
The first thing that we identified was that there was a specific change on these flanges. This is what the flange is supposed to look like. This is what we found. There was a layer of paint, of epoxy paint that has been painted on the contact surfaces. The immediate question was that, could we experience something called coating creep? We didn't know. We saw this imprint here in the paint, but we didn't know if that was caused immediately by the high pretension, or if it was something that the epoxy start to flow, and it started to creep over time, and then we lose the pretension in the bolt.
That kicked off, you know, the field measurement verification program that we will dig deeper into here. The first question here was, how can we trust the measurements? It's always a good practice to perform an MSA. We're using something called the bolt stretch method here, where we are actually measuring the length of the bolt, and we measure the elongation when we apply the force. By doing that, we can calculate how much is the force that this bolt can apply.
We did a Type I Gage Study. We found an approximate standard deviation of 0.01 millimeter, which when we calculated that and converted this to load, it represents 10 kip. We also measured, actually; here, I just want to mention it. We had an analog micrometer. We didn't have all the equipment that we would like to have. This is how it is in the field. An analog micrometer with a scale or a resolution of 0.01 millimeter is actually a little bit too large for this here. What we did is that we measured and looked between the readings, and we also noted down when we had 0.005 millimeter differences there.
In addition to that, we were also worried about thermal drift. That was solved by having an identical bolt that we placed in close proximity, or actually exactly where we're going to perform this experiment. Before every measurement and after every measurement, we measure the length of this bolt. This was something that went on over several days. You will see it later. Of course, there were some changes in temperature and wind and rain and things like that when you are 100 miles off the coast. This enables us to compensate for thermal drift and cancel that out of the equation.
We started to look at the possibility if there was actually a creep due to this coating here. We were looking at it. We measured the bolts. We had six bolts here on one riser flange. We started off measuring it like a baseline measurement, which was that we made up the bolt with the full torque, took a measurement, we waited 2.5 hours, 8.5, 15, and 20 hours. During that time, we measured if there was a change in stretch of the bolt. What we found was actually that that was not the problem. We would expect them to have a curve going up in the high end here and continuing down. We didn't see that behavior. There is a variation here in the measurements. This was considered to be reasonable based on the MSA results.
Also, of course, this went on over, as you can see here, 21 hours. Inspector fatigue is also a real concern here, but we didn't see anything that we considered a problem with this. Under this condition, that was cleared. The challenge here instead became that the scatter here was much larger than we expected. We started to look at that and see how can we move forward, and how can we see and understand the situation with the bolt scatter here.
Initially, we thought that bolt numbers 1, 2, and 3 were made up by 1 wrench, 1 torque wrench. You can see that they look quite similar, and this was another population. That was an assumption that we made, and we started to look at this, and okay, it doesn't look great, but it's probably handleable. When we plotted this here, we can see that for the torque wrench four and torque wrench aft, you see this is bigger, this bigger scatter on the aft, but we are calculating about 30% plus or minus in pretension when you do a torque method, so it's not really concerning.
We saw that there is a small shift in the mean here. Probably the assumption was that by adjusting the pressure, we can actually push this one up here, and then we could have a good result. These are hydraulic torque wrenches. You supply them in a hydraulic fluid. By adjusting the pressure, you can increase the torque, and then you can increase the preload. What we found, however, was that we had a mix on the data here. This was actually what happened. Torque wrench aft made bolt number 1, 5, and 6, and the 4 torque wrench made 2, 3, and 4.
That drastically changed situation because the preload scatter here became much bigger than we expected and what is normally used as best practice when we go in literature and from testing that we have done. There was something here that happened. It turned from a special cause variation where we just believed that we can change the mean to a common cause variation. You see the means are quite good, but the scatter here is just much, much bigger than we expected.
We went on to a task here to try to reduce the common cause variation. We started to look at the inspection, cleaning, greasing, and tightening protocols where we could reduce it. We also mapped all other factors that we could think about where we have implemented the improvements of the process. We also found that there was a mix between different bolts of different coating. Big portion of the load disappears in friction, and the friction behavior between Xylan, which is a PTFE coating, and phosphate is, in theory, very different. We decided that this should be a part of the experiment. We designed a very beautiful 16-run RSM experiment here. If you plot it right, it looks like a flower in Graph Builder, very beautiful.
That was the plan. Based on this, we could then fine-tune the pressure and find the optimal position for this makeup sequence here. Then the operational window closed. We suddenly became in the critical path for the rig to go back in production with a hefty, hefty cost per day. Pressure start to arise, and we couldn't complete this design. We ended up with a study where we could test one joint with phosphate, one with Xylan bolts.
In addition to that, one of these torque wrenches broke. We ended up with just one data point for the aft wrench on Xylan. This was just the reality that happened. We were sitting in the night, me and Magno, and trying to figure out how we're going to solve this situation and what can we do like this.
Anyway, started to try to fit the model. Not surprisingly, not very well. We have a very big standard error on this area here where we had just one data point. The r², adjusted r², was just 0.17, 80% of the observation was not explained by the model, so the decision was clear, we cannot use this model to build a safety case. This is not a good way to predict something critical like this.
This pivoted here. We know that we have a big, big process variation. Even though after we did the mitigating actions, we managed to push down the variation quite a lot, but it's still quite a high variation. We also know that the offshore industry works with big safety factors. There is a lot of contingency, a lot of conservatism into all the designs and all calculations. We said, okay, let me give it a shot. Let's build a very conservative model. We took the upper 95% bound for the standard deviation, and we took the mean what we estimated based on the testing and starting to build a model around that.
The mean was okay, not a big variation there. This also agrees pretty well with the calculated values and things like that, while we had a big scatter here on the standard deviation, so we used upper 95% confidence bounds. Even if you have the small dataset, we believed that this would be a conservative approach. Based on that, we built the Monte Carlo simulation. The process was, you sample six bolts. We built virtual flange based on the distributions from these different six bolts. We calculated the clamp force resistance. The clamp force, we actually have two different failure modes here. One is that we have a total separation of the flange, so that it separates totally. The other one is a partial separation, where it separates on one side.
We did two different sets. One was the sum of all the six bolts preload, and the other one was the sum of the three weakest adjacent triplet bolts. That was another acceptance criteria that we put. We repeated this for N virtual flanges. We used the capability analysis to see what was the probability of failure or flange separation at different threshold, and based on this, we could then extract data points and plot the probability of failure versus tension sensitivity curves. On this axis here, we have the connector tension in kip, and here we have the probability value of failure in PPM.
Immediately, we saw here that, of course, when you're looking at close to the rating of the equipment, which is 3,500 kips, the values don't look that good, actually, but that is also something that is on the edge. This is never going to be used. It's used in some areas when you're running riser and BOP in some cases, stuff like that, but operationally, you're well below that.
Then we start to look at the numbers here that looks promising. Remember that this is PPM values. This is very, very low probabilities. The question then came up then: how good are these tails that we're talking about here? Because we are working here with very low probabilities, very rare events are very aligned on the tails of distributions. Looking here at the 1,500 kip, that was like, okay, where are we here? How reliable is this Monte Carlo simulation? The question was, how many simulations do we need to estimate this?
Common practice is for an event that is 10⁻ⁿ, 10ⁿ⁺¹ simulations are required, but that is just not practically possible here. We know that we are using a fitted parametric distribution, so we're not counting events. That would for sure help us, but how much? The way we approach this was that treated as a process control question. Used IMR charts. We did sequential independent runs from 10,000 simulations, 50, 100, up to 3 million simulations. We plotted the progress or the results here for 1,500 kip tension and 3,500 kip tension. We also tested the other ones in between that, but these were the extremes.
When we have done up here to 3 million iterations, we did six independent runs, and we checked what were the control limits and how much was the variation. For 1,500 kip, we had control limits that were 1.72×10⁻³⁷ to 2.39×10⁻³⁷ PPM. It's extremely low, but it's also quite some variation, which is expected. We are far, far out in the tails here. The consecutive run variation was 12.4%, which is actually quite large, but in practical terms, these numbers here are just, you know, they are approaching zero.
We were not worried about this, really. We looked at the 3,500 kips, and we saw a much more stable process where we have 0.74% variation between the two runs of the verification phase here. We were happy with that one. We believe that we can build this here. Just as a reference, when you're doing a convergence study for an FE analysis, we are talking about a few percent normally that is acceptable, so 0.1% here at the load rating was absolutely fine. It converged at all evaluated loads.
Then we had the resistance part of the curve, which we know how much these connectors can take depending on the different loading conditions here. The next step was, of course, to connect this to the loading that was supplied by Magno and Petrobras here. What we could see is that this is the plot that was being transferred to JMP, the raw data to plot. We can see here that there is nowhere on this riser string where we have an effective tension that is even close to these values here. Everything is actually below 1,600 kip here.
That means that we put us in a range here with a partial flange separation of a probability of 3.62 to the power of minus 21 parts per million, which is extremely low. It allowed us to move forward, and we got confidence in this. This is, to me, the beauty of a Monte Carlo simulation. You take a problem that is quite complex and difficult to solve analytically, but if you manage to set it up right, you can get a very reliable and very easy-to-understand results.
The conclusion was that the probability of failure is extremely low. That was not what they needed to worry about here. The key lessons here that we went through, one of the first one is that doing things in the field, and specifically doing something offshore where conditions are changing, there are waves, there are rig heave, and tilt, and pitch, the equipment is moving on your measure point, statistical rigor is very important.
We found that by doing statistical analysis with JMP, we could expose and actually quantify uncertainties rather than hiding it. Instead of being a black box, and we need to do a risk assessment where we don't really know how big is the risk, we could actually do a quantitative risk assessment here. When assumptions failed, we managed to replace them with conservative and transparent modeling choices. When the model initially failed, there was no idea to hang on to that one. We found the conservative approach. We know the engineering behind the equipment. We have big safety factor. It's a very robust product that we have, so by the end we could be very conservative, still show that this would be okay.
Another interesting lesson here is that we worked together, engineering analysis and statistical analysis complemented each other here. We have the engineering analysis run by a 3,000-meter FEA model Magno ran, and this one actually complements the statistical analysis here. Together here, we got the complete picture of that one. It was a very good collaboration here between Petrobras as user of the equipment and HMH here as the product, the design owners of this one.
By the end, we could clear the operation. It was late in the night the day before the planned operation was planned, and this was something that we could really clear and go ahead. You can continue. This will not cause any problems for your operation. Thank you.
Thank you.