Greetings,
I'm using JMP 17, I tried to set control limit for chart A (x-bar) and chart B (R)
edt is the data table.
below is my script:
graph = edt << Control Chart Builder(
Size( 1123, 586 ),
Show Alarm Report( 1 ),
Show Control Panel( 0 ),
K Sigma( 2.5 ),
Variables( Subgroup( :CaptureDateTime ), Y( :CaptureValue ) ),
Chart(
Position( 1 ),
Limits,
Set Control Limits( {LCL( 49.5 ), UCL( 50.5 ), Avg( 50 )} ),
Warnings( Test 1( 1 ), Test 3( 1 ) )
),
Chart(
Position( 2 ),
Set Control Limits( {LCL( 0 ), UCL( 0.8 )} ),
Warnings( Test Beyond Limits( 1 ) )
))
but once I run the script, it does not set the control limits. Anyone knows how to set control limit in script?
thank in advanced