Choose Language Hide Translation Bar
Highlighted
skapan
Community Member

reliability recurrence analysis with multiple right censored data due to overhaul

Hi I am trying to fit a NHPP model for the maintenance data of a group of systems. Bust systems have a periodic overhaul. JMP only alows one right censored data per system. But for my data some systems have 3 or 4 overhaul over the observation period. Can I enter more than one right censored data for a system.
Example data for a system
syatem id     cumulative time  to event         type of event
1                             1000                                 overhaul
1                             1544                                 Failure
1                             1728                                 Faiule
1                             2015                                overhaul
1                             2607                                 failure
1                             2900                                  end of obsvervation right censored datat 

0 Kudos