Subscribe Bookmark RSS Feed

How To Re-Draw Charts / Graphs / Plots in JMP Reports (.jrp files) - Resizing Axis

jkelleyjr

Community Trekker

Joined:

Aug 27, 2016

Is there an option / preference / setting toggle somewhere that can be turned on so that when you re-size an analysis output in a .jrp that JMP automatically 'redraws the missing lines / curves' ??  See pic below, this is from a Reliability Analysis .jrp report and the scales have been resized, but the curves don't re-draw / re-trace.