<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: How can I calculate Pooled Variance Estimate in JMP? in Discussions</title>
    <link>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84731#M37920</link>
    <description>Thank You very much. I knew it was hiding in there somewhere!</description>
    <pubDate>Thu, 29 Nov 2018 15:22:39 GMT</pubDate>
    <dc:creator>WanderedProcess</dc:creator>
    <dc:date>2018-11-29T15:22:39Z</dc:date>
    <item>
      <title>How can I calculate Pooled Variance Estimate in JMP?</title>
      <link>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84728#M37917</link>
      <description>&lt;P&gt;Hello JMP Community,&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;How&amp;nbsp;can I calculate Pooled Variance in JMP?&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I am hoping, as with all things&amp;nbsp;JMP, this exists and I have just not found the magic pathways to produce the desired&amp;nbsp;results quickly and efficiently.&amp;nbsp; I can of course do this by going through the actual maths myself, but I have frequently run into this situation so it would be great to learn if this already exists in JMP.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;I have a data set that is grouped by process conditions which have differing means as a result of process centering (tuning) activities.&amp;nbsp; I would like to generate a pooled variance estimate for this process for use in specifications/capability estimates in support of this new process launch.&amp;nbsp; My total run count is rather low so for initial process variability/capability discussions I would like to do this to increase my N count.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Technical Situation&lt;/P&gt;&lt;P&gt;- Process 1&amp;nbsp;Condition A, was running at lower end&amp;nbsp;of our desired process window [n=8]&lt;/P&gt;&lt;P&gt;- Process 1 Condition B, changed our tuning lever to center the process (new) to the desired target [n=10]&lt;/P&gt;&lt;P&gt;- The process change resulted in a mean shift, but&amp;nbsp;did not change the process variability (and fundamentally was not expected to)&lt;/P&gt;&lt;P&gt;- I would like to generate the "Pooled Variance" estimate for the P1CA + P1CB&lt;/P&gt;&lt;P&gt;- As this is a new process, my data set is limited, so the desire is to use this to enable a increase n count during initial capability discussions&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;This is the simply case.&amp;nbsp; I have much more complex cases but they all follow this same scenario where variance is unaffected when a lever was pulled to create a mean shift.&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;Thank You,&lt;/P&gt;&lt;P&gt;WanderedProcess&lt;/P&gt;&lt;P&gt;&amp;nbsp;&lt;/P&gt;&lt;P&gt;***sorry if a thread exists detailing this.&amp;nbsp; I did try searching key terms I am familiar with. =-] ***&lt;/P&gt;</description>
      <pubDate>Thu, 29 Nov 2018 14:33:21 GMT</pubDate>
      <guid>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84728#M37917</guid>
      <dc:creator>WanderedProcess</dc:creator>
      <dc:date>2018-11-29T14:33:21Z</dc:date>
    </item>
    <item>
      <title>Re: How can I calculate Pooled Variance Estimate in JMP?</title>
      <link>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84730#M37919</link>
      <description>&lt;P&gt;If you only have 2 groups, can't you just do the One-way Analysis in Fit Y by X (red-arrow &amp;gt; Mean/ANOVA/Pooled t)?&amp;nbsp; The Mean Square Error (MSE)&amp;nbsp;is the pooled variance estimate.&amp;nbsp; You can grab that from the ANOVA table or by squaring the RMSE in the summary.&lt;/P&gt;</description>
      <pubDate>Thu, 29 Nov 2018 15:13:06 GMT</pubDate>
      <guid>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84730#M37919</guid>
      <dc:creator>cwillden</dc:creator>
      <dc:date>2018-11-29T15:13:06Z</dc:date>
    </item>
    <item>
      <title>Re: How can I calculate Pooled Variance Estimate in JMP?</title>
      <link>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84731#M37920</link>
      <description>Thank You very much. I knew it was hiding in there somewhere!</description>
      <pubDate>Thu, 29 Nov 2018 15:22:39 GMT</pubDate>
      <guid>https://community.jmp.com/t5/Discussions/How-can-I-calculate-Pooled-Variance-Estimate-in-JMP/m-p/84731#M37920</guid>
      <dc:creator>WanderedProcess</dc:creator>
      <dc:date>2018-11-29T15:22:39Z</dc:date>
    </item>
  </channel>
</rss>

