Control Chart & 3 Sigma
With reference to the table attached: I have about 30 observations. The values have a std deviation of 0.534121. The average is: 73.93235. Now if I want to calculate the control limits based on the thumb rule of ± 3 sigma, the limits come out to: 72.3 LCL and 75.5 UCL.However if I plot a control chart with the table in the attachment, the UCL and LCL are calculated to be: 72.852 to 75.01. I am un...